A friend asked me, today, if I was playing guitar. I had to laugh, because, I don’t really play the guitar, so much as I practice the guitar. To play infers some degree of musicality to the thing. There is really very little music being made here. But, yes, I continue to wrestle with this project I’ve embarked on to learn to play the guitar. I’m working on simple bar chords and the G and C chords and transitioning between the two. I’m not finding it particularly easy. I think I’ve hit the first wall. Really, what I need to work on is timing and counting out my measures. I’ve been a little frustrated and I must admit that I haven’t dedicated near as much time as I promised myself. I was told by Guitar Center that it may be August or October before they start in person lessons again, so I really need to rededicate myself and get on top of this whole discipline thing.

I think my fingers are getting better, but I am not a “natural” guitarist. This is all work and not much fun. Enjoyable, but not fun.

I’ve started a series of summer projects that I’m contracting out. I put a deposit down on getting my roof replaced. Should get done in the next 3-weeks or so. I’m having the same company, Avalon, replace my chain link fence with a pine, shadowbox privacy fence. That starts this coming Thursday. And I’m getting the electrical box, meter, and drop upgraded to a 200 amp circuit. Oh, and I’m getting a breaker panel added to the garage as well. That was supposed to have happened last Thursday, but storms in the area caused the utility to cancel the appointment due to address outages. Very excited about getting all that done.

I’ve got plans drawn up for a 12 x 20 shed with an attached 8 x 8 greenhouse and a 4-foot wide porch. The plan also includes screening in the covered patio and building a deck over the open patio. The deck will extend 6-feet past the existing patio and wrap along the side of the covered patio. I’m going to have to get a permit for all that work. You know what… here’s a picture. That’ll save a thousand words.

the red items are the changes/additions

Oh, and because I haven’t put enough on my plate, I’m just waiting for the inspection on the electrical stuff before adding a door and drywalling the garage. Maybe then I can get the garage put back together and get the car back inside. And of course, I really am getting motivated to get the laundry room and common area of the basement finished, primed, and painted.

We picked up paint for the front room and plants for the planters at Home Depot on Saturday. Those are things that probably need to be done as well.

I’ve got a lot of plans. Maybe too many plans. It’ll be fine. Later.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>