Flooring Has Begun

There were a few things that had to be taken care of before the flooring could start tonight. In particular, I forgot that the transition from the hallway to the bathroom wasn’t finished. That required a couple pieces of particle board to be cut and fittedĀ  in the base of the door frame. It’s done, but not something I had figured into my plan for tonight. I also put up the light fixture above the forthcoming vanity, caulked the base of the tub in preparation for the floor, installed the wall diffuser, and spent way too much time cleaning the sub-floor of drywall mud, paint, sawdust, and other assorted goodies. But I did get started on the vinyl plank flooring.

vanity lamp

allure vinyl plank flooring

And, yes, it is going far slower than I imagined it would. I could push and finish it tonight, but no. I’m done until tomorrow.
Against all common sense, I’m going to tell you what I think will get done tomorrow… Finish the flooring. Then redo the plumbing and set the toilet. And finally, bring the vanity up from the basement and put it, the sink, and the faucet in place. I’d like to think that I’d be getting the trim cut and painted in there somewhere, but I’m probably overestimating things already.

Leave a Reply

Your email address will not be published. Required fields are marked *