Oh sure, there’s lots of stuff left to do. Floor trim and quarter round on top of that, towel bars and paper holder hung, medicine cabinet and vanity mirror put up, gotta do something about the bath fan, then there are doors for the shower and the bathroom itself, but functionally; functionally it’s done and everything works.

vanity is set to go

cluttered with tools

The walls are up and finished. The floor is down. Shower is in and plumbed. Toilet is in and plumbed. And as of last night, I can say, the vanity is in and plumbed.
The office, however, is looking a little worse for wear as the project closes in on completion. It’s probably time to put some of these tools away.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>