Today’s vacation update, just so you don’t think I’m slacking.

  • I added an outlet to basement bedroom 3.
  • Set up the bed frame and moved the King and Queen mattresses out of BB3 and into BB2
  • Rewired the GFCI outlet in the basement bathroom so that it is on its own 20 amp circuit.
  • Finish sanded the hallway between the bedrooms and bathroom.
  • Hung the door in the laundry room.
  • Hung drywall outside laundry room and hall to basement bedroom 1, then taped and mudded both walls.
  • Second coated the walls in BB2.
  • Hung the blinds in BB3 and repaired the dresser drawers and added the pulls.
  • Back-filled a few posts this morning for the website.
  • Oh, and I Cleaned up the basement so the dog would have less debris to chew on.

That was my day in a nutshell. No pictures right now, maybe in the morning.
I’m out. Later.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>