Working Vacation Update

I’ve been working on the third basement bedroom, today. I’m calling it the third, because it is the farthest from the stairwell of the three bedrooms. Thus making the nearest the first basement bedroom. The door is installed, the trim is all up, the nail holes have been caulked. Still need to touch up the trim paint, paint the door, and paint the shelf and drawers.
I’m going to put a shelf and rod in the closet and then put mirrored sliding doors up. I’m thinking that even though it’s in the basement, between the two windows and a set of mirrored doors, it should be nice and bright.
20140701_22343020140701_223408